shunting
英 [ˈʃʌntɪŋ]
美 [ˈʃʌntɪŋ]
v. 使(火车或火车车厢)转轨; 调往,转至(次要的地方)
shunt的现在分词
BNC.45230
柯林斯词典
- VERB (通常因为不方便而)将…转移至别处,将…调往别处
If a person or thingis shuntedsomewhere, they are moved or sent there, usually because someone finds them inconvenient.- He has spent most of his life being shunted between his mother, father and various foster families...
他一生中的大部分时间都在他母亲、父亲及各种各样的寄养家庭之间辗转度过。 - Independent thinkers are shunted into minor jobs or refused promotion.
见解独到的人士要么被调往次要的岗位,要么就不被提升。
- He has spent most of his life being shunted between his mother, father and various foster families...
- VERB 使(火车车皮或车厢)转轨
When railway enginesshuntwagons or carriages, they push or pull them from one railway line to another.- The GM diesel engine shunted the coaches to Platform 4.
通用柴油动力火车头将车厢转轨到了 4 号月台。
- The GM diesel engine shunted the coaches to Platform 4.
双语例句
- Research on Automatic Generation of Interlock Forms for Train Route and Shunting Route Based on Graphic Structure
基于图形结构的列车/调车进路连锁表的自动生成算法研究 - How to check the filament real-time status of white light signal in a shunting signal is discussed deeply in the case of not affecting stability and safety of signal equipment in use.
在不影响现有设备稳定性和安全性的前提下,对实时检查调车信号机白灯灯丝的情况进行探讨。 - Payrolls will be further trimmed by shunting staff to low-cost locations, and introducing greater automation and process efficiencies.
随着员工分流至低成本地区,引入自动化设备和提高流程效率,公司的薪资成本也会进一步削减。 - Such small defects do not produce significant left-to-right shunting, but they do increase the risk for infective endocarditis.
虽然这种小缺损不足以导致从左到右的分流,但增大了感染性心内膜炎的危险性。 - Shunting operation is the center of marshalling yard organization, and is the important component of the whole railway transportation.
调车是编组站工作组织的中心环节,是铁路运输过程的重要组成部分。 - The operating standard for railway shunting& Railway shunting the operating standard for the simple hump
GB/T7178.4-1996铁路调车作业标准铁路调车简易驼峰作业标准 - Also in the AC voltage mode, low-input shunting capacity is necessary for high-frequency operation.
在AC(交流)电压模式中,低输入的分流容量对高频率的操作运行是必要的。 - Analysis and Main Countermeasure on Train Injury Accident-prone Situation of the Shunting Operation in the Railway System
全路调车作业车辆伤害事故多发情况分析及应采取的主要对策 - The boxcars can be rearranged at a shunting yard that has an input track, an output track, and K holding tracks between the input tracks and output tracks.
该车厢可以重新排列在一个调车场具有一个输入采样,输出跟踪,和K之间举行的输入和输出轨轨道轨道。 - The through route and combined shunting route shall be handled section by section based on the sections they contain.
通过进路和组合调车进路应按其包括的各段进路逐段办理。
